Skip to main content
Work back from demand to packaging needs and order dates. These are planning numbers, not a production schedule or a purchasing system.

Finished beer before packaging

Finished beer already in stock at the production facility covers demand first. Only the balance needs packaging. Taproom stock is excluded. Stock that isn’t matched to a product can’t cover its demand. Expand Finished-stock coverage by SKU to check the allocation.

Shortfalls and order dates

The table shows which packs can’t be filled in which weeks, what runs out, and the order-by date. Order dates work back from the packing week using the lead time and a safety buffer. Shared items (such as lids) are used once across products; shortages don’t carry forward to the next week. See Check packaging order dates.

Packaging inputs

Packaging stock, open orders, the pieces each pack needs and lead times are editable planning inputs. Some lead times came from the brewery; others are assumed and labelled as such. Save every change with a name and a note.
The page doesn’t place orders. Check the earliest order date and what runs out before discussing an order with a supplier.